|
SUBSURFACE LANDFILL FIRE
SUPPRESSION AND MONITORING
A Case Study at the Campbell
Mountain Landfill, Penticton, British Columbia
Initial
Monitoring Results.
(continued from previous page)
| Table
2 Initial
Temperature Readings from the gas Monitoring Wells |
| Number |
Thermistor
Depths
(m from surface) |
Temperatures
at Each Depth
(Degrees Celsius) |
| GMW98-1A |
3.8 |
32.1 |
| . |
8.8 |
43.4 |
| . |
13.8 |
42.7 |
| . |
18.8 |
36.4 |
| . |
23.8 |
30.5 |
| . |
27.8 |
24.8 |
|
GMW98-2A |
1.45 |
11.5 |
| . |
6.45 |
52.1 |
| . |
11.45 |
61.8 |
| . |
16.6 |
51.7 |
|
GMW98-3A |
3.9 |
68.9 |
| . |
10.4 |
64.8 |
| . |
15.7 |
44.7 |
|
GMW98-4A |
3.75 |
31.3 |
|
GMW98-4A |
7.85 |
33.7 |
|
GMW98-5A |
2.5 |
23.7 |
| . |
8.1 |
41.9 |
| . |
13.75 |
44 |
|
GMW98-6A |
5 |
38.6 |
| . |
10 |
46.8 |
| . |
15 |
46.0 |
| . |
20.4 |
35.3 |
|
GMW98-7A |
4 |
36.2 |
| . |
9 |
53.1 |
| . |
14 |
42 |
| . |
19 |
29.5 |
|
GMW98-8A |
2.75 |
18.8 |
| . |
7.25 |
20.0 |
|
|
|
         
next page
initial temperature monitoring continued
|